Table of Contents
maxLevel2

...

  • Calculation: set up and evaluate calculation charts.
  • Configuration: set up basic data and make assignments for metering.

Architecture 

...

The calculated consumption of a meter will be charged to the Cost center.

Configuration

Click the Configuration button Image Modified on the left-side menu of the Metering app to open the Configuration page. 

Toolbar functions

Function

Description

Image Modified

Add 

  • Folder
  • Meter
  • Cost center
  • Resource
  • Cost rate

Image Modified

Edit name of selected folder

Image Modified

Delete selected element

Image Modified

Copy

Image Modified

Paste

Image Modified

Show chart of selected trending

Image Modified

Show cost center plan view

Image Modified

Show configuration view

Image Modified

Switch to multi-select mode.

Image Modified

Export metering

Image Modified

Import metering

Image Modified

Import ETS structure


On this page the components and structures of the metering have to be set up:

  • Cost rate
  • Resource
  • Trending
  • Meter
  • Cost center
  • Cost center plan


This page has two view modes:

The project tree is always shown on the left hand side.

  • Configuration view mode

On the right hand side details of the project tree are shown.

Use this view to set up cost rates, resources, meters and cost centers. 

To switch to this view click the Show configuration button from the menu bar.

  • Cost center plan view mode

On the right hand side the cost center plan is shown as a tree. There is only one cost center plan -

...

the root node neither can be deleted nor created new.

Use this view to add cost centers or meters to the cost center plan. Adding an element to the cost center plan is done by drag & drop with the mouse.

To switch to this view click the Show Cost Center Plan button from the menu bar.


Note: The configuration view is used for setting up metering components.

The Cost Center Plan view is used to assign components as cost centers and meters to the Cost Center Plan by drag & drop!

On this page the components and structures of the metering have to be set up:

Cost rate

...

...

Cost rate

The cost rate defines the price for a resource per unit.

Column nameDescription
Name *Name of the cost rate
DescriptionAdditional description for the cost rate
Default price *Price per unit

In the project tree cost rates appear with the symbol .

...

In the project tree cost centers appear with the symbol .

Assingments

Assign a cost center to the cost center plan

Assign a meter to a cost center

Caclulation

Click the Calculation button Image Modified on the left-side menu of the Metering app to open the Calculation page.