Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents

...

  • Projects: the inventory of visualization projects related to the current server workspace.
  • Devices: configured devices for visualization
  • Users: assign users to visualization devices
  • Groups: assign groups to visualization devices
  • Configurations: set up specific permissions for layers and modules, set visualization workspace variables

Projects

Click the Projects button Image Modified on the left-side menu of the Visualization Management App to open the Projects page. 

The list shows the projects, the number of defined devices, the date when the project was imported received last time and the date, when the project was uploaded the deployed the last time.

Existing projects, created with the Visualization Editor, can be imported by clicking the button Select File.

To make the project available for the web clients it has to be uploaded deployed to the web server.


FunctionDescription

Import an existing project

Delete project

Switch to multi-select mode

Upload Deploy project to the web server

Refresh page

Devices

Click the Devices button Image Modified on the left-side menu of the Visualization Management App to open the Devices page. 

Each project needs at least one device definition. Later on, user permissions are defined on devices.

...

FunctionDescription

Add a device

Copy device

Delete device

Switch to multi-select mode

Shows details of a connected web client. The client can be disconnected.

 

start the visualization

Refresh page

Users

Click the Users button Image Modified on the left-side menu of the Visualization Management App to open the Users page. 

The list on the left side shows the users defined in User Management. To authorize a user for a project select one or more projects on the right side.

Groups

Click the Groups button Image Modified on the left-side menu of the Visualization Management App to open the Groups page. 

The list on the left side shows the groups defined in User Management. To authorize a group for a project select one or more projects on the right side.

Configurations

Click the Configurations button Image Modified on the left-side menu of the Visualization Management App to open the Configurations page. 

The list on the left hand side shows configurations. A configuration can be done per project, per device and per user or group.

...

FunctionDescription

Add a configuration

Duplicate configuration

Delete configuration

Switch to multi-select mode


NameDescription
NameName of configuration

Device

List of devices defined on the Devices page.
User/GroupList of users/groups defined on the Users or Groups page.
ProjectList of projects defined on the Projects page.
Item Link Filecsv file for item mapping
Select Filecsv file for item mapping
HomepageOne page of the project can be defines as homepage.

...