Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
maxLevel2

Click the Calculation button Image Modified on the left-side menu of the Metering app to open the Calculation page. This page is opened by default, when starting the Metering app. 

Image Modified

Content

The page consists of two areas:

  • On the left hand side the cost center plan or the project tree appears.
  • On the right hand side the calculation chart appears.

Views

This page has two view modes:

  • Project tree view
  • Cost Center Plan view

Project tree view

This is the default view. The left hand side shows the project tree, including trendings, and an empty calculation chart appears on the right hand side.

Use this view to

  • create folders and new calculation charts. 
  • show previously created calculation charts.
  • add trendings to the calculation chart.

Cost Center Plan

The left hand side shows the cost center plan and on the right hand side, again, an empty calculation chart appears.

Use this view to add a meter, a cost center or the whole cost center plan to the calculation chart on the right hand side. To add an element to the calculation chart, select it in the cost center plan and drag it on the calculation chart with the mouse.


Calculation chart

Refer to Create calculation chart how to edit a calculation chart.

Navigation

Within the calculation chart

  • zoom in and zoom out using the mouse wheel.
  • drag the chart with the mouse to view another time period.