Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
maxLevel2

Create a new calculation chart

To create a new calculation chart, open the Calculation page and switch to the Cost Center Plan view.

Drag e.g. a cost center from the cost center plan on the left hand side to the calculation chart on the right hand side - repeat this step for additional cost centers.

A dialog asks to select the resource and how to add the series to the calculation chart.

Select the option Show itemized values to display each meter point of the selected resource.

This means if a cost center has 2 meter points assigned for electricity - select Show itemized values to see both meter points and the sum of them in the chart (3 bars shown in the chart), otherwise the chart will only show the sum of the meter points (1 bar in the chart).

Note

Note the following difference:

  • Adding a cost center with its meter point to the calculation chart: the bar chart shows the consumption of the cost center.
  • Adding the meter point of a cost center to the calculation chart: the bar chart shows the total consumption of the meter point.

Edit an existing calculation chart

Open the Calculation page, select the calculation chart to edit and click the Configuration button image2020-3-3_11-42-0.pngImage Modifiedin the header section.

The following image shows the configuration of a calculation chart:

Image Modified

Content

The page consists of four areas:

  • Name area
  • Meter point list area
  • Trending list area
  • Y axis list area

...

FieldDescription
NameName of the calculation chart (mandatory).
DescriptionDescription Chart description.
Chart type

Normal (default): shows the values of trendings and meter points.

Period comparsion: compare the data of a period to data of another period defined by an offset.

...