Create a new calculation chart
To create a new calculation chart, open the Calculation page and switch to the Cost Center Plan view.
Drag e.g. a cost center from the cost center plan on the left hand side to the calculation chart on the right hand side - repeat this step for additional cost centers.
A dialog asks to select the resource and how to add the series to the calculation chart.
Select the option Show itemized values to display each meter point of the selected resource.
This means if a cost center has 2 meter points assigned for electricity - select Show itemized values to see both meter points and the sum of them in the chart (3 bars shown in the chart), otherwise the chart will only show the sum of the meter points (1 bar in the chart).
Note |
---|
Note the following difference:
|
Edit an existing calculation chart
Open the Calculation page, select the calculation chart to edit and click the Configuration button in the header section.
The following image shows the configuration of a calculation chart:
* indicates a required field.
Content
The page consists of four areas:
- Name area
- Meter point list area
- Trending list area
- Y axis list area
...
Field | Description |
---|---|
Name | Name of the calculation chart (mandatory). |
Description | Chart description. |
Chart type | Normal (default): shows the values of trendings and meter points. Period comparsion: compare the data of a period to data of another period defined by an offset. |
...