Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Click the Configuration button  on the left-side menu of the Metering app to open the Configuration page. 

Toolbar functions

Function

Description

Add 

  • Folder
  • Meter
  • Cost center
  • Resource
  • Cost rate

Edit name of selected folder

Delete selected element

Copy

Paste

Show chart of selected trending

Show cost center plan view

Show configuration view

Switch to multi-select mode.

Export metering

Import metering

Import ETS structure


On this page - the Configuration page - the components 

  • Cost rate
  • Resource
  • Meter
  • Cost center

and assignments to the cost center plan must be set up.


This page has two view modes:

  • Configuration view mode

The project tree is shown on the left hand side - the right hand side shows details of the project tree.

Use this view to set up cost rates, resources, meters and cost centers. 

To switch to this view click the Configuration button from the menu bar.

  • Cost center plan view mode

The project tree is shown on the left hand side - the right hand side shows the cost center plan as a tree. There is only one cost center plan - the root node neither can be deleted nor created newly.

Use this view to add cost centers or meters to the cost center plan. Adding an element to the cost center plan is done by drag & drop with the mouse.

To switch to this view click the Cost Center Plan button from the menu bar.


The Configuration view is used for setting up metering components.

The Cost Center Plan view is used to assign components as cost centers and meters to the Cost Center Plan by drag & drop!

Cost rate

The cost rate defines the price per unit for a resource.

Column nameDescription
Name *Name of the cost rate
DescriptionAdditional description for the cost rate
Default price *Price per unit

In the project tree cost rates appear with the symbol .


In the current version the cost rate is not used yet!

Resource

The resource is defined by a name, a unit and it references to a cost rate.  

Column nameDescription
Name *Name of the resource
DescriptionAdditional description for the resource
Unit *Unit of the resource
Cost rateAssignment of the cost rate
Consumption factorDeactivated, for future use

In the project tree resources appear with the symbol .

Meter

A meter is defined by its name and references to a trending and to a resource.

Column nameDescription
Name *Name of the meter
DescriptionAdditional description 
Meter Type *Default: Increasing
TrendingAssignment of the trending
Resource *Assignment of the resource

In the project tree meters appear with the symbol .


Trending

The trending for a typical metering contains the following settings:

To keep this example simple, this trending was configured to read the data from the server item NETx\Today\Seconds. This is a fast way to get (test) data to show in the Metering app. 

Minimal / typical trending property settings for metering:

Column nameSetting
EnabledTurn on
Name *Enter the name of the trending
Item *Select the server item which provides the meter readings
Type *Select All
AggregationTurn on

Cost center

The calculated consumption of a meter is charged to the assigned cost center. 

Column nameDescription
Name *Name of the cost center
DescriptionAdditional description for the meter

CostcIn the project tree cost centers appear with the symbol .

Build up a cost center plan

Assigning a cost center

Cost centers can be assigned to cost centers or directly to the root of the cost center plan.

Open Configuration page and switch to Cost center plan view.

Select the cost center in the project tree on the left hand side and drag it to the cost center plan or a cost center on the right hand side.

A dialog asks for the percentage how much of the cost (calculated for the cost center) will be forwarded to the parent.


Animation - Assigning two cost centers to a cost center plan:

Assigning a meter

A meter can be asssigned to a cost center or directly to the root of the cost center plan. The default name of the cost center plan root node is the same as for the workspace. 

Open Configuration page and switch to Cost center plan view.

Select the meter in the project tree on the left hand side and drag it to the cost center plan or a cost center on the right hand side.

A dialog asks for the percentage how much of the cost (calculated for the cost center) will be charged to the cost center.


Animation - Assigning a meter to two cost centers, charging 50% of the meter to each cost center:

  • No labels