Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
maxLevel2

Click the Configuration button Image Modified on the left-side menu of the Metering app to open the Configuration page. 

Image Modified

Content

The page consists of several areas:

  • At the beginning of the page the toolbar appears.
  • On the left hand side the project tree appears.
  • On the right hand side details of the selected element from the project tree appear.


On this page - the Configuration page - the components 

and assignments to the cost center plan must be set up.

Views

This page has two view modes:

Configuration view mode

The project tree is shown on the left hand side - the right hand side shows details of the project tree.

Use this view to set up cost rates, resources, meter points and cost centers. 

To switch to this view click the Configuration button Image Modified from the menu bar.

Cost center plan view mode

The project tree is shown on the left hand side - the right hand side shows the cost center plan as a tree. There is only one cost center plan - the root node neither can be deleted nor created newly.

Use this view to add cost centers or meters to the cost center plan. Adding an element to the cost center plan is done by drag & drop with the mouse.

To switch to this view click the Cost Center Plan button Image Modified from the menu bar.


Note

The Configuration view is used for setting up metering components.

The Cost Center Plan view is used to assign components as cost centers and meters to the Cost Center Plan by drag & drop!

...

Toolbar functions

Function

Description

Image RemovedImage Added

Add 

Edit name of selected folder

Delete selected element

Copy

Paste

Show chart of selected trending

Show cost center plan view

Show configuration view

Switch to multi-select mode.

Export

Image RemovedImage Added

Import

Image RemovedImage Added

Import ETS structure

...