Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

Table of Contents
maxLevel2

Click the Configuration button Image Modified on the left-side menu of the Metering app to open the Configuration page. Image Removed

...

Content

The page consists of several areas:

  • At the beginning of the page the

    function bar is shown

    toolbar appears.

  • On

    On the left hand side the project tree appears.

  • On the right hand side details of the selected element from the project tree appear

    .

Toolbar functions

...

Function

...

Description

...

Image Removed

...

Add 

...

Image Removed

...

Image Removed

...

Image Removed

...

Image Removed

...

Image Removed

...

Image Removed

...

Image Removed

...

Image Removed

...

  • .

...

Image Removed

...

Image Removed

...

Image Removed

...


On this page - the Configuration page - the components 

and assignments to the cost center plan must be set up.

Views

This page has two view modes:

Configuration view mode

The project tree is shown on the left hand side - the right hand side shows details of the project tree.

Use this view to set up cost rates, resources, meters meter points and cost centers. 

To switch to this view click the Configuration button Image Modified from the menu bar.

Cost center plan view mode

The project tree is shown on the left hand side - the right hand side shows the cost center plan as a tree. There is only one cost center plan - the root node neither can be deleted nor created newly.

Use this view to add cost centers or meters to the cost center plan. Adding an element to the cost center plan is done by drag & drop with the mouse.

To switch to this view click the Cost Center Plan button Image Modified from the menu bar.

Note

The Configuration view is used for setting up metering components.

The Cost Center Plan view is used to assign components as cost centers and meters to the Cost Center Plan by drag & drop!

Cost rate

The Edit cost rate defines the price per unit for a resource.

Image Removed

...

In the project tree cost rates appear with the symbol Image Removed.

Note

In the current version the cost rate is not used yet!

Resource

The resource is defined by a name, a unit and it references to a cost rate.  

Image Removed

...

In the project tree resources appear with the symbol Image Removed.

Meter

A meter is defined by its name and references to a trending and to a resource.

Image Removed

...

In the project tree meters appear with the symbol Image Removed.

Trending

The trending for a typical metering contains the following settings:

Image Removed

To keep this example simple, this trending was configured to read the data from the server item NETx\Today\Seconds. This is a fast way to get (test) data to show in the Metering app. 

Minimal / typical trending property settings for metering:

...

Cost center

The calculated consumption of a meter is charged to the assigned cost center. 

Image Removed

...

In the project tree cost centers appear with the symbol Image Removed.

Edit resource

Edit meter point

Edit cost center

Build up a cost center plan

Assigning a cost center

Cost centers can be assigned to cost centers or directly to the root of the cost center plan.

...

A dialog asks for the percentage how much of the cost (calculated for the cost center) will be forwarded to the parent.

Animation - Assigning two cost centers to a cost center plan:

Image Removed

Assigning a meter point

A meter point can be asssigned assigned to a cost center or directly to the root of the cost center plan. The default name of the cost center plan root node is the same as for the workspace. 

Open Configuration page and switch to Cost center plan view.

Select the meter point in the project tree on the left hand side and drag it to the cost center plan or a cost center on the right hand side.

A dialog asks for the percentage how much of the cost (calculated for the cost center) will be charged to the cost center.

Animation - Assigning a meter to two cost centers, charging 50% of the meter to each cost center:

Image Removed

Toolbar functions

Function

Description

Image Added

Add

Image Added

Edit name of selected folder

Image Added

Delete selected element

Image Added

Copy

Image Added

Paste

Image Added

Show chart of selected trending

Image Added

Show cost center plan view

Image Added

Show configuration view

Image Added

Switch to multi-select mode.

Image Added

Export

Image Added

Import

Image Added

Import ETS structure