Create cost center
The calculated consumption of a meter is charged to the assigned cost center.
The following image shows the form to edit a cost center.
* indicates a required field.
Column name | Description |
---|---|
Name | Name of the cost center. |
Description | Additional description for the cost center. |
In the project tree cost centers appear with the symbol .